Tiles go on the wall before the bath goes in. Easy to get the wrong way round on paper, and a pain to put right once it's grouted. Build Phaze catches it automatically.
Three bathroom jobs. One of them is in the wrong place.
Easy to get the wrong way round on a list, and a pain to put right once it's grouted. Move the jobs, then check the order.
- Bathroom first-fix plumbing
- Bathroom fit-out (fixtures)
- Wall tiling
Sample job. Your own plan works the same way.
Step through a floor, in the order it gets built
Each job waits on the one before. Press the button and watch the spirit level settle.
- Chase services into slab1 day
- Screed the floor2 days
- Fit island carcass1 day
- Template and fit worktop1 day
The pipes and cables go into the slab before the screed does. Do it later and you're breaking the floor up to get at them.
Sample job. Your own plan works the same way.
When the budget runs over, it already knows what's safe to cut
Cheapest isn't always safest. Build Phaze ranks cuts by what would cost least to do later, in money or time, or lets you defer them to a later phase instead. Try the cuts first, apply them when you're happy, and bring any back later.
Four sections, one question each
Build Phaze is split by what you're trying to find out, not by feature. Pick a section.
What can I do now?
What you can start today, what's waiting on something, and what needs a decision from you.
- Ready to start
- Waiting
- Needs you
Build Phaze